Sunday 7 February 2016

Power run. Update from site supervisor

The site supervisor called on Friday.  Window alteration not possible as there is 5 week lead time on them & they are due onsite next week.  He has advised we can get a film installed post build that will do the job (& other clients have been very happy with).  Happy with the solution

Forward schedule for the next couple of weeks includes
  • finish roof structure
  • fascia and gutters
  • roof insulation blanket and colorbond installed
  • HWS solar panel installation
  • Windows
  • Start brick laying
Had a look at the site this morning.  The electrician has run the 3 phase from the house to the electrical pit.  Now just need the power company to install the meter and make the connection in the pit.