Wednesday 24 February 2016

Building wrapped

The house received its wrap (vapour barrier) yesterday.


Had a look tonight; the plumber has been busy

  • Gas pipe run (from meter position to all outlets)
  • Hot and cold water pipes fitted off (now waiting to be crimped)
  • Solar hot water panel fitted and connected

The TV antenna has also been installed.

Unfortunately the antenna has been installed on the roof's northern aspect.  Whilst we had advised Henley that we would be installing solar, it appears that didn't make it through to specific instructions in the plans to leave that aspect vacant.   A sewer breather is also on the northern aspect.  These items are not on the plans so we didn't challenge them.  Annoying, but hopefully don't impinge on where PV solar and pool heating need to be installed.