Slab was poured on Wed 27/01 & then it started raining. 20+ mm later it is still there & looking good
One of the slab extensions wasn't done (pad for A/C unit). The site supervisor has referred it to engineering & it will be done later (a little disappointing, but not the end of the world).
Found out on Thursday that the sparky has had an issue connecting the power to the pit. The fence's foundations are too big to get through or under. Now looking at options that don't include losing the fence (hoping a concrete core drill will make it through, although it's about 800mm long).