Wednesday 25 May 2016

Getting close to handover

Our site supervisor opened the house for us today so our flooring guys could measure up and the solar PV installer could have a look

Lots of progress.  Electrical and plumbing fit-offs done

What's left to complete

  • Painting touch-ups, glazed door painting + final wall coat in the garage
  • Tile grouting (tile left off for bath installs)
  • Shower screens
  • Robes
  • Lock replacement on sliding doors
  • Door hardware
  • Hydronic heating panel installation + boiler and pump
  • External aircon unit, duct vents and air return vent
  • Hot water storage tank and gas booster
  • Ceiling cavity insulation
  • Building clean
  • Garage Doors
  • Appliance installation including range hood (post handover)
Expecting handover in three or so weeks (depending on any defects during final walk-through)



Tuesday 10 May 2016

Thursday 5 May 2016

Countdown is on ...

Internal fit out is well underway and the countdown is on with approx 8 to 10 weeks left ...


  • Cabinets have been installed in kitchen, bathrooms and laundry


  • Internal and external painting started


  • Caesarstone benchtops installed


No pictures for this phase as the house is locked up tight.